Revised Timeline 3
Tues 22
- work on final model
- revise the lasercut drawings (figure out what cut I need for the 3/16" model, double check with prof)
- bought & lasercut most of the acrylic
- LASERCUTTER ISSUES! Must lasercut more on Monday after break!
(RAILINGS??!??!?!?!?!?)
Wed 23
- finalize elevation
- finalize section drawings
- do a very rough mock-up of final boards
- PSYCH TAKE HOME EXAM + WRITE-UP & PRESENTATION
Thur 24
- finalize plan drawings
- review and finalize the elevation and section drawings again
- set up final boards
- work on scale plantings
Fri 25
- touch up all drawings
- revise final boards
- work on scale plantings
Sat 26
- revise final drawings and boards *north arrows, labels, colouring etc...
- work on scale plantings
- IPRO PRESENTATION LAYOUT 8:00 PM meeting @ Lower Core
Sun 27
- revise final boards
- finish final model & take photos for making renderings
- build 3/16" cutaway model
- DO RENDERINGS
Mon 28
- LASERCUT REST OF PIECES
- INSERT SCALE PLANTINGS
- FINISH MODEL AND TAKE PHOTOS
- DO RENDERINGS
- PLOT FINAL BOARDS
- build 3/16" cutaway model
- touch up models
Tues 29
- finish 3/16" cutaway model
- write up final review speech
- freak out and touch everything up (I will be behind on something, more than likely the models and renderings)
Wed 30 - FINAL REVIEW
- prepare for the review - sleep and eat
P.S. I promise after all this craziness is over I'm going back to the regular form of my blog entries and there will be pics of my models!!!! Wooo.
No comments:
Post a Comment