Revised Timeline 3

Tues 22
  • work on final model
  • revise the lasercut drawings (figure out what cut I need for the 3/16" model, double check with prof)
  • bought & lasercut most of the acrylic
  • LASERCUTTER ISSUES! Must lasercut more on Monday after break!
    (RAILINGS??!??!?!?!?!?)
Wed 23
  • finalize elevation
  • finalize section drawings
  • do a very rough mock-up of final boards
  • PSYCH TAKE HOME EXAM + WRITE-UP & PRESENTATION
Thur 24
  • finalize plan drawings
  • review and finalize the elevation and section drawings again
  • set up final boards
  • work on scale plantings
Fri 25
  • touch up all drawings
  • revise final boards
  • work on scale plantings
Sat 26
  • revise final drawings and boards *north arrows, labels, colouring etc...
  • work on scale plantings
  • IPRO PRESENTATION LAYOUT 8:00 PM meeting @ Lower Core
Sun 27
  • revise final boards
  • finish final model & take photos for making renderings
  • build 3/16" cutaway model
  • DO RENDERINGS
Mon 28
  • LASERCUT REST OF PIECES
  • INSERT SCALE PLANTINGS
  • FINISH MODEL AND TAKE PHOTOS
  • DO RENDERINGS
  • PLOT FINAL BOARDS
  • build 3/16" cutaway model
  • touch up models
Tues 29
  • finish 3/16" cutaway model
  • write up final review speech
  • freak out and touch everything up (I will be behind on something, more than likely the models and renderings)
Wed 30 - FINAL REVIEW
  • prepare for the review - sleep and eat
P.S. I promise after all this craziness is over I'm going back to the regular form of my blog entries and there will be pics of my models!!!! Wooo.

11/22/2011

Revised Timeline 2

Tues 22
  • work on final model
  • revise the lasercut drawings (figure out what cut I need for the 3/16" model, double check with prof)
  • buy the materials, lasercut the acrylic
  • finish the lasercut on the model
  • take pictures of model in site for rendering purposes
Wed 23
  • finalize elevation
  • finalize section drawings
  • do a very rough mock-up of final boards
  • PSYCH TAKE HOME EXAM + WRITE-UP & PRESENTATION
Thur 24
  • finalize plan drawings
  • review and finalize the elevation and section drawings again
  • set up final boards
  • work on interior and exterior renderings
  • work on scale plantings
Fri 25
  • work on interior and exterior renderings
  • touch up all drawings
  • revise final boards
  • work on scale plantings
Sat 26
  • work on interior and exterior renderings
  • revise final drawings and boards *north arrows, labels, colouring etc...*
  • work on scale plantings
  • IPRO PRESENTATION
Sun 27
  • revise final boards
  • finish final model
  • build 3/16" cutaway model
Mon 28
  • plot final boards
  • build 3/16" cutaway model
  • touch up models
Tues 29
  • finish 3/16" cutaway model
  • write up final review speech
  • freak out and touch everything up
Wed 30
  • prepare for the review - sleep and eat

11/19/2011

Last Concert

Picture of the Day] Our concert poster. We are the 99%...of people who sing at IIT. XD Just kidding.
Mood] Sad
Weather] High 45. Overcast.
Currently] In the cube.
Quote of the Day] "
Try not to become a man of success but rather to become a man of value."

My final acappella concert was last night. It was definitely sad and there was a little tearing up beforehand, ok, well a lot of tearing up, but I am glad now. I am proud that I have helped shape an all-female singing group at this school, that the name of the group is one that I came up with as a joke which caught on, and of course #1 --I got to spend my time with an amazing set of ever growing absolutely beautiful and loving women. They are fantastic and have made my time at IIT even better than I could have imagined. I will miss them terribly, but I hope to visit in the spring and continue arranging music for them to sing.

:)
~Jaye

11/14/2011

Revised Timeline 1

Revised Timeline 1. This will change again, I am sure.

Mon 14
  1. finalize glazing design
  2. create glazing lasercut CAD DWG
  3. finalize col support (elevation/plan)
  4. finalize wall section detail
  5. plans for the exhibition areas
  6. 1/8" model mock-up
Tues 15
  1. plans for the exhibition areas
  2. finalize col support (elevation/plan)
  3. finalize wall section detail
  4. 1/8" model mock-up
Wed 16
  1. 1/8" mock up review
  2. plans for the exhibition areas review
  3. start work on final model
  4. start work on final cutaway model
Thur 17
  1. plans for the exhibition areas
  2. work on final model
  3. review plans for the exhibition areas
Fri 18
  1. plans for the exhibition areas
  2. work on final model
  3. review plans for the exhibition areas
Sat 19
  1. work on final model
  2. work on cutaway model
Sun 20
  1. work on final model
  2. work on cutaway model
Mon 21
  1. work on cutaway model
  2. try and finish as much of models as possible
  3. work on interior and exterior renderings
Tues 22
  1. work on cutaway model
  2. try and finish as much of models as possible
  3. work on interior and exterior renderings
Wed 23
  1. finalize elevation
  2. finalize section drawings
  3. work on exterior and interior renderings
  4. set up final boards
Thur 24
  1. review and finalize the drawings again
  2. set up final boards
Fri 25
  1. review final boards
Sat 26
  1. revise final drawings and boards *north arrows, labels, colouring etc...*
Sun 27
  1. revise final boards
  2. finish cutaway model
  3. finish final model
Mon 28
  1. plot final boards
  2. touch up models
Tues 29
  1. write up final review speech
  2. freak out and touch everything up
Wed 30
  1. prepare for the review - drink a bottle of gatorade and have a banana

11/11/2011

11/11/11

I missed round one. I caught the nighttime edition but it was technically 23:11:11. Conclusion: fail. :(

11/08/2011

The Final Stretch

Deadlines....deadlines...ugh...So when you lay out deadlines in architecture school the rule is to multiply the amount of hours you THINK it's going to take by at least two or three. I make a habit of just adding a zero on the end. We're told to make a timeline for ourselves and really stick to it as a reference for deadlines, but it's soooo difficult and it's nearly impossible to get things done perfectly on time with so many adjustments needing to be made all the time. So here is my 'timeline' for my deadlines to get me to the final review.

Tues 8
  1. finalize col support (elevation/plan)
  2. insert railings
  3. adjust glazing (two schemes)
  4. finalize wall section detail
Wed 9
  1. review w/prof & make any adjustments
  2. review big site model in class
  3. finalize glazing design
  4. create glazing lasercut CAD DWG
Thur 10
  1. adjust glazing CAD (review)
  2. finalize glazing design
  3. create glazing lasercut CAD DWG
  4. mock-up for 1/8" model (clearing)
Fri 11
  1. horizontal study CAD DWG
  2. vertical study CAD DWG
  3. mock-up for 1/8" model
Sat 12
  1. mock up for 1/8" model
  2. decide on either horizontal vs. vertical
  3. plans for the exhibition areas
Sun 13
  1. mock up for 1/8" model
  2. plans for the exhibition areas
Mon 14
  1. plans for the exhibition areas
  2. 1/8" model mock-up review
Tues 15
  1. plans for the exhibition areas
  2. start work on final model
  3. start work on final cutaway model
Wed 16
  1. plans for the exhibition areas
  2. work on final model
  3. work on final cutaway model
Thur 17
  1. work on final model
  2. review plans for the exhibition areas
Fri 18
  1. work on final model
  2. review plans for the exhibition areas
Sat 19
  1. work on final model
  2. work on cutaway model
Sun 20
  1. work on final model
  2. work on cutaway model
Mon 21
  1. work on cutaway model
  2. try and finish as much of models as possible
Tues 22
  1. work on cutaway model
  2. try and finish as much of models as possible
Wed 23
  1. set up final boards
  2. finalize elevation
  3. finalize section drawings
Thur 24
  1. set up final boards
Fri 25
  1. review final boards
Sat 26
  1. revise final boards
Sun 27
  1. revise final boards
  2. finish cutaway model
  3. finish final model
Mon 28
  1. plot final boards
  2. touch up models
Tues 29
  1. write up final review speech
Wed 30
  1. prepare for the review

11/01/2011

11/1/11 -- Wish

Semester's winding down. I wish all my friends the best of luck. We can do it!

The countdown begins. 26 days til final review.